Turkey
,
Asia

Wind Power in Turkey

Supplied by
Climate Trade
Picture(s) taken from
. All rights reserved to the Owner.
Supplied by
Climate Trade
Average Price per tCO2e
€1.62
View details
Project details

The Awind plant, commissioned in 2018, has 25 turbines with a 50 MW capacity. It generates 120 GWh annually, benefiting the local community economically and reducing GHG emissions.

Project details

The Awind plant, commissioned in 2018, has 25 turbines with a 50 MW capacity. It generates 120 GWh annually, benefiting the local community economically and reducing GHG emissions.

Supplied by
Climate Trade
Average Price per tCO2e
€1.62
View Details
Location

Turkey

,

Asia

Group@2x
In Stock (Credits)

5,430

Vintage

2023

Method

Energy Solutions

Verification

Independent