Installation of a new biomass cogeneration power plant in the Vinales sawmill site. The plant is equipped with a new 210 ton/hr fluidized bed biomass power boiler and a 41 MW condensing/extracting turbo generator unit.
Installation of a new biomass cogeneration power plant in the Vinales sawmill site. The plant is equipped with a new 210 ton/hr fluidized bed biomass power boiler and a 41 MW condensing/extracting turbo generator unit.
Chile
,
South America
4,976
2015
Energy Solutions
Verra